Gypsum Works

Gypsum Works

Professional gypsum board, partition, and ceiling installation systems.

SBC Saudi Building Code CertifiedISO 9001:2015 & ISO 45001 Compliant
Service Overview

Engineering Excellence in Gypsum Works

Thobal delivers complete gypsum works for commercial, residential, healthcare, and hospitality interiors. Our teams install gypsum board partitions, suspended ceilings, acoustic wall panels, bulkheads, and feature architectural details, built to coordinated shop drawings with MEP integration. Every installation combines fire-rated, moisture-resistant, and acoustic board specifications with certified metal stud framing and high-quality finishing for seamless painted surfaces.

Key Benefits

Why Clients Choose Thobal

  • Gypsum partitions, ceilings, and feature walls
  • Fire-rated, moisture-resistant, and acoustic systems
  • Metal stud framing with certified installation
  • Coordinated shop drawings with MEP integration
  • High-standard jointing and finishing
  • SBC-compliant materials and workmanship
Scope of Work

Scope of Work & Deliverables

Dedicated engineering supervision and full-scope execution across every stage of gypsum works.

Gypsum works covers partitions, suspended ceilings, bulkheads, and feature walls using certified metal stud framing and standard, fire-rated, moisture-resistant, or acoustic board systems. Layouts are set out from approved drawings with openings coordinated, and acoustic mineral wool or rock wool is installed within partitions where required.

Execution follows a sequenced method — setting out, framing, board fixing, jointing, and finishing — with surface flatness, framing, and fire-rating verification before handover. Quality is assured through layer inspection and documented compliance, while safety governs work at height and tool handling. Deliverables include shop drawings, material certificates, and as-built documentation for a seamless finished interior.

Gypsum Works delivered by Thobal
Phase 01

Layout & Setting Out

Wall and ceiling layouts set out from approved drawings with openings coordinated.

SBC & ISO Compliant Deliverable
Phase 02

Metal Stud Framing

Certified steel track and stud installation with correct spacing and bracing.

SBC & ISO Compliant Deliverable
Phase 03

Gypsum Board Installation

Standard, fire-rated, moisture-resistant, or acoustic board fixed to the frame.

SBC & ISO Compliant Deliverable
Phase 04

Acoustic Insulation

Acoustic mineral wool or rock wool insulation installed within partitions and ceilings.

SBC & ISO Compliant Deliverable
Phase 05

Jointing & Finishing

Taped, filled, and sanded joints prepared for a seamless painted finish.

SBC & ISO Compliant Deliverable
Phase 06

Inspection & Handover

Surface flatness, framing, and fire-rating verification with documented handover.

SBC & ISO Compliant Deliverable
Delivery Workflow

Execution Process

A structured delivery roadmap ensuring milestone accuracy from initial consultation to project commissioning.

01

Consultation

We begin with a deep understanding of your project requirements, site conditions, and programme objectives through detailed consultation and feasibility assessment.

02

Planning

Our engineering team develops a comprehensive project execution plan, including methodology, resource allocation, procurement strategy, and risk mitigation measures.

03

Engineering

Detailed engineering design, BIM modelling, and constructability reviews ensure every element is optimised for performance, cost-efficiency, and buildability.

04

Construction

Skilled execution by our experienced workforce, with rigorous quality control, safety management, and programme tracking throughout the construction phase.

05

Quality Inspection

Comprehensive inspection and testing protocols verify that every deliverable meets the specified standards before proceeding to the next stage.

06

Project Handover

Systematic commissioning, documentation, and client training ensure a seamless handover with full operational readiness and aftercare support.

Client Enquiries

Frequently Asked Questions

Common technical and commercial questions regarding gypsum works execution.

Yes. We install fire-rated gypsum systems with certified assemblies and correct fire-stopping details.
Yes. We install acoustic rock wool or mineral wool within partitions and ceilings for sound control.
Yes. All layouts are set out from approved architectural and MEP-coordinated drawings.
Thobal construction project site
Project Consultation

Let's Build Your Next Landmark Project

Our engineering consultation team is ready to analyze your requirements and provide tailor-made proposals.